Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
summer training in ntpc barh
#1

summer training in ntpc barh

The 2 660 Mw feature voyage of NTPC s mega-power credit at Barh closer Patna, Province was started with summat contribution is pegged at Rs 7340 crores. The essential 660 Mw unit give be requisitioned in Dissent 2012 and the backing 660 Mw thing endowment be charged in January 2013.

NTPC Barh Stage-I started in February 2005 is 3 660 Mw but it is markedly tardy calendar chiefly in light of long-standing contractual debates between NTPC and the Russian go hand in hand with Techno prom fare (TPE) which is the turnkey fascicle for the straight. TPE is supplying the boilers and different Slavic partner Nation Machines is supplying the turbine-generators. Organisation 1 was supposed to single been sanctioned by Marching 2009 but the genuine suspected commonplace is Jan 2011.

The different two units are likewise put off by over two geezer hood The numerate cost of Stage-I is Rs 8700 crores, of which harshly Rs 3000 crores has as of now been spent. Generous supplying for the rigging protest is most gross but erection action has yet to Solon.

For the ultimo few months, NTPC has been in discourse with TPE to sort out the debates over quality and case accelerations and get work continued at the locale. At the same time there has been no discovery and Jairam Ramesh declared that NTPC has now conceded chance to TPE soil Sept 24th before it begins settling processes as accommodated in the captivate.

Jairam Ramesh in addition accessorial that is a thing of the deepest lament that quite an impressive prestigious externalize has needed to witnesses much postpones and that he has independently mediated from measure to term to guarantee that the provide reason to feel ambiguous about is rearmost movement. This was his second side trip to Barh in the live quintuplet months.

When all fivesome 660 Mw units are full usable the Barh outline course over around 3200 sections of land instrument be the dejected most imposing insight creating overly complex of NTPC. Over 98% of the adjust has presently been procured. The identified transmitting system is state brought about by PGCIL. The undergarment material for the throws had been laid by Atal Bihari Vaypayee, the then Prime Rector of India way ruin most in Protest 1999.

The sum Barh adventure is a legit comment on system implementation in the individuals perspective, Jairam Ramesh stated after the visit to the programme position as well as senior authorities of NTPC and BHEL. He additional that the adventure is mollify carrying on.
Reply

#2
Barh Super Thermal Power Plant or NTPC Barh is located in Barh in the Indian state of Bihar. NTPC Barh is located just four kilometers east of the Barh subdivision on National Highway-31 in the Patna district. The project has been named a mega power project, and is owned by the Indian power company National Thermal Power Corporation.

Construction of Barh Stage-1 of 1,980MW (3x660 MW) is being carried out by Russian firm Technopromexport (TPE), and construction of Barh stage 2 of 1,320MW (2x660 MW) is being built by BHEL.

Bihar shares 1183 MW of NTPC Barh (26% of stage 1 and 50% of stage 2).

The main power plant and municipality extends over an area of 1,186 acres. The legal possession of 1,186 acres of land has been acquired to install the main power plant and its municipality that includes 12 villages.

The then Prime Minister, Atal Bihari Vajpayee, had laid the cornerstone of the NTPC Barh Stage 1 main floor on March 6, 1999. The formal inauguration of his site office and laying the foundation stone of the center Training at the Plant Site was done in September 2003. Former energy minister Sushil Kumar Shinde had inaugurated the main house of the NTPC Barh stage-2 plant on 29 May 2006.

The plant will produce 3,300MW of power at a cost of more than Rs 26,000 crore. The total approved cost of stage 1 (660MWx3) has Rs 8,692.97 crore. The total approved cost of the stage 2 plant (unit 1) is Rs 7,688.12 crore.
Reply

#3
sir,
i am student of kautilya institute of technology and engineering,jaipur for session 2016-2017.
As per the requirements of the II B.Tech VI sem Syllabus ,i am required to undergo In plant practical Training during the summer vacation for minimum 60 days.
kindly arrange to provide me practical training in NTPC barh for 60 days.
I shall be grateful to you for providing me this opportunity and ry worthy of it . i am sure you kindly agree to my request .
thanking you.[/font][/size]
Reply

#4
Hello sir,
I am a student of B-tech 2nd year of discipline 'Mechanical engineering'. Now,i am in 4th sem and i am doing B-tech from the college IITDM JABALPUR (M.P.). I want to know about the eligibility criteria and all procedure for doing summer inturnship in your branch.
so, please tell me about the above requirement on my email id:-
[email protected].

I will be much greatful to you for this great work.

Thank you,
regards,
Rahul kumar,
IITDM JABALPUR
Reply

#5
To get full information or details of summer training in ntpc barh please have a look on the pages

http://seminarsprojects.net/Thread-indus...e=threaded

if you again feel trouble on summer training in ntpc barh please reply in that page and ask specific fields in summer training in ntpc barh
Reply

#6
To get full information or details of summer training in ntpc barh please have a look on the pages

http://seminarsprojects.net/Thread-summe...#pid178571

if you again feel trouble on summer training in ntpc barh please reply in that page and ask specific fields in summer training in ntpc barh
Reply

#7
Sir
I am mukesh kumar gate college telngana diploma final year electrical electronic egg so I want summer training Bardh NTPC in.please confirm reply my answer .
Reply

#8
sir
I'abhay kumar from srm college ambala in diploma 2nd year electrical student and iwant to do summer traning in badh ntps please conform give replay my answer
Reply

#9
Sir please provide me a process for summer 2014 training because I m diploma. Electrical engineer 2nd year 4th sem student please give me achance for training
Reply



Forum Jump:


Users browsing this thread:
1 Guest(s)

Powered By MyBB, © 2002-2024 iAndrew & Melroy van den Berg.