Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Adaptive Partition Scheduler
#1

Adaptive Partition Scheduler

Adaptive Partition Schedulers are a relatively new type of partition scheduler, pioneered with the most recent version of the QNX operating system. Adaptive Partitioning (or AP) allows the real-time system designer to request that a percentage of processing resources be reserved for a particular subsystem (group of threads and/or processes). The operating systems priority driven pre-emptive scheduler will behave in the same way that a non-AP system would until the system is overloaded (i.e. system-wide there is more computation to perform, than the processor is capable of sustaining over the long term). During overload, the AP scheduler enforces hard limits on total run-time for the subsystems within a partition (as dictated by the allocated percentage of processor bandwidth for the particular partition). If the system is not overloaded, a partition that is allocated (for example) 10% of the processor bandwidth, can, in fact, use more than 10%, as it will borrow from the spare budget of other partitions (but will be required to pay it back later). This is very useful for the non real-time subsystems that experience variable load, since these subsystems can make use of spare budget from hard real-time partitions in order to make more forward progress than they would in a Fixed Partition Scheduler such as ARINC-653, but without impacting the hard real-time subsystems deadlines.
Reply

#2
Adaptive Partition Schedulers are a relatively new type of partition scheduler, pioneered with the most recent version of the QNX operating system. Adaptive Partitioning (or AP) allows the real-time system designer to request that a percentage of processing resources be reserved for a particular subsystem (group of threads and/or processes). The operating systems priority driven pre-emptive scheduler will behave in the same way that a non-AP system would until the system is overloaded (i.e. system-wide there is more computation to perform, than the processor is capable of sustaining over the long term). During overload, the AP scheduler enforces hard limits on total run-time for the subsystems within a partition (as dictated by the allocated percentage of processor bandwidth for the particular partition). If the system is not overloaded, a partition that is allocated (for example) 10% of the processor bandwidth, can, in fact, use more than 10%, as it will borrow from the spare budget of other partitions (but will be required to pay it back later). This is very useful for the non real-time subsystems that experience variable load, since these subsystems can make use of spare budget from hard real-time partitions in order to make more forward progress than they would in a Fixed Partition Scheduler such as ARINC-653, but without impacting the hard real-time subsystems deadlines.
Reply

#3
type of partition scheduler, pioneered with the most recent version of the QNX operating system. Adaptive Partitioning (or AP) allows the real-time system designer to request that a percentage of processing resources be reserved for a particular subsystem (group of threads and/or processes). The operating systems priority driven pre-emptive scheduler will behave in the same way that a non-AP system would until the system is overloaded (i.e. system-wide there is more computation to perform, than the processor is capable of sustaining over the long term). During overload, the AP scheduler enforces hard limits on total run-time for the subsystems within a partition (as dictated by the allocated percentage of processor bandwidth for the particular partition). If the system is not overloaded, a partition that is allocated (for example) 10% of the processor bandwidth, can, in fact, use more than 10%, as it will borrow from the spare budget of other partitions (but will be required to pay it back later). This is very useful for the non real-time subsystems that experience variable load, since these subsystems can make use of spare budget from hard real-time partitions in order to make more forward progress than they would in a Fixed Partition Scheduler such as ARINC-653, but without impacting the hard real-time subsystems deadlines.
Reply

#4
you can refer these page details of "Adaptive Partition Scheduler"link bellow

http://seminarsprojects.net/Thread-adapt...6#pid51196

http://seminarsprojects.net/Thread-adapt...-schedular
Reply

#5
hi
yopu can find out all informations about

http://seminarsprojects.net/Thread-adapt...-scheduler Adaptive Partition Scheduler
Reply

#6
Adaptive Partition Scheduler
i hav to tak seminar on dis topic..so pls help me to find some details on dis..
Reply

#7
hai
i want full details of Adaptive partition schduler. Can u send that plz
Reply



Forum Jump:


Users browsing this thread:
1 Guest(s)

Powered By MyBB, © 2002-2024 iAndrew & Melroy van den Berg.