Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
NTPC DADRI
#1

Presented by:
DIGVIJAY SINGH

[attachment=5763]


NTPC was set up in the central sector in the 1975 in response to widening demand & supply gap with the main objective of planning, promoting & organizing an integrated development to thermal power in India. Ever since its inception, NTPC has never looked back and the corporation is treading steps of success one after the other. The only PSU to have achieved excellent rating in respect of MOU targets signed with Govt. of India each year.
NTPC has an installed capacity of 19,291 MW from its commitment to provide quality power; all the operating stations of NTPC located in the National Capital Region & western have acquired ISO 9002 certification. The service groups like Engineering, Contracts, materials and operation Services have also bagged the ISO 9001 certification. NTPC Dadri, Ramagundam, Vindhyachal and Korba station have also bagged ISO 14001 certification.
Today NTPC contributes more than 3 / 5th of the total power generation in India.

Introduction

The development of the sector in the country, since independence has been predominantly through the State Electricity Boards. In order to supplement the
effects of the states in accelerating power development and to promote power development on a regional basis to enable the optimum utilisation of energy resources, the Government of India decided to take up a programme of establishment of large hydro and thermal power stations in the central sec tor on a regional basis. With this in view, the Government set up the National Thermal Power Corporation Ltd., in November 1975 with the objective of planning, construction, commissioning, operation and maintenance of Super Thermal and Gas Based Power projects in the country.

The availability of gas in a large quantity in western offshore region has opened an opportunity to use the gas for power generation, which is an economical way and quicker method of augmenting power generating capacity by natural gas as fuel in combined cycle power plant in a power deficit country like ours. With this intention in mind the Government asked NTPC to take up the construction of Kawas, Auraiya, Anta, Dadri and Gandhar Gas Power Project along the HBJ Gas pipe line.

The power plant consists of gas turbine generating units waste heat recovery boilers, steam turbo generator, ancillary electrical and mechanical equipments. The power generated at this power station is fed over 220 KV AC transmission system associated with this project to distribute the power in the various Regions.
In the Power Sector, gas turbine drive generators are used.

Gas turbines range in size from less than 100 KW up to about 140.000 KW. The gas turbine has found increasing application due to the following potential advantages over competive equipment.
Small size and weight per horsepower
Rapid loading capability
Self-contained packaged unit
Moderate first cost
No cooling water required
Easy maintenance
High reliability
Waste heat available for combined cycle application.
Low Gestation Period
Low Pollution Hazards

The function of a gas turbine in a combined cycle power plant is to drive a generator which produce electricity and to provide input heat for the steam cycle. Power for driving the compressor is also derived from gas turbine.
Reply

#2
PRESENTED BY- L SANDIP KUMAR

[attachment=7821]

ABOUT NTPC
NTPC has installed capacity of 29,394 MW.
15 coal based power stations (23,395 MW)
7 gas based power stations (3,955 MW)
4 power stations in Joint Ventures (1,794 MW).
The company has power generating facilities in all major regions of the country.
NTPC, was setup in 1975 world s largest .
In Forbes list of World s 2000 Largest Companies for the year 2007, NTPC occupies 411th place.

NTPC DADRI PLANT DETAILS
First Unit Commissioned 1975 (95MW)

Installed Capacity (840+817) MW

Derated Capacity 980 MW

Coal Source Jharkhand Coal Fields

Water Source Upper Ganga Canal

Unit Sizes 4x210 MW + 2x490MW

CONTROL AND
INSTRUMENTATION LAB


MANOMETRY LAB

PYROMETRY LAB

AUTOMATIC CONTROL SYSTEMS LAB

PROTECTION & INTERLOCKING LAB

FURNACE SAFEGAURD SUPERVISORY SYSTEM LAB

MANOMETRY LAB
This Lab. Consists of :
Sensor

Indicator

Scale/Recorder



Reply

#3
[attachment=5975]
NTPC DADRI

NTPC was set up in the central sector in the 1975.Only PSU to achieve excellent rating in respect of MOU targets signed with Govt. of India each year. NTPC Dadri station has also bagged ISO 14001 certification.
Today NTPC contributes more than 3 / 5th of the total power generation in India.

Location-
National Thermal Power Corporation Limited
National Capital Power Station - Dadri
P.O. Vidyut Nagar
District Gautam Budh Nagar
PIN- 201 008
Uttar Pradesh
India
Reply

#4
plz provide company profile and funtional departments of ntpc dadri including objectives, capital structure,features , bord of directors,trade unions
Reply

#5

To get more information about the topic "NTPC DADRI " please refer the page link below
http://seminarsprojects.net/Thread-ntpc-dadri
Reply



[-]
Quick Reply

Forum Jump:


Users browsing this thread:
1 Guest(s)

Powered By MyBB, © 2002-2024 iAndrew & Melroy van den Berg.