CKNOWLEDGEMENT
Words fail me to express my sincerest gratitude to this esteemed organization, which hasconferred on us the privilege to pragmatically convert our theoretical knowledge into practicalviable experience. During the course of my training at
400Kv GSS HEERAPURA, JAIPUR
somany people have guided me and I will remain indebted to them throughout my life for makingmy training a wonderful learning experience.I would like to thank
MR. ANOOP MAHESHWARI
my project head
,
who gave meopportunity to work in his department and guided me through my project from time to time. Hiswords were a true inspiration for me. The exposure that I have got here would not have been possible without his kind support.He took keen interest in my project and ensured that my tenure here is a learning experience for alifetime for me.I would like to thank
MR. A.P VISHNU
sir and all those operators, Diploma Engineer Traineesand my trainee colleagues with whom I had developed a special bond.
PREFACE
As per the requirement of
B. Tech
. Course,
400Kv GSS HEERAPURA, JAIPUR (RAJ.)
has been kind enough to permit me to complete my Practical Training of 30 days.
This report prepared during the practical training which is student s first and
greatest treasure asit is full of experience, observation and knowledge.The summer training was very interesting and gainful as it is close to real what has been studiedin all the years through was seen implemented in a modified and practical form.GSS is the means of connection between generating station and consumer by providing safetyand reliability of system in case of default.This substation step down the incoming voltage power transmission to the required valve andthen is supplied to the consumer feeder or GSS done by connecting auto transformer operationand requirement of various equipment have been include in detail , further in case of report isthe bus bar.Arrangement of different feeder level and switch yards included information of bus bar arrangement of different level isolator and growing substation also power transformer circuit breaker oil, filtration plant, and compression protection control room and place are leveled.