Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Least Cost System Operation: Economic Dispatch 1
#1

Introduction

Complex system time scale separation
Least cost system operation
Economic dispatch first view
Generator cost characteristics
Four curves of generator performance
Constrained optimization
Linear programming
Economic dispatch completed

Long term system planning: Production cost
Decide what to build
Hourly to monthly decisions: Unit commitment
Decide which plants to have warmed up and ready to go
Different technologies have different requirements
Minutes to Hour: Economic dispatch
Decide which plants to use to meet the expected load now
5 minutes to 1 hour
Cycles to Minutes: Short term system operations and Load Flow Model
Maintain supply and demand balance moment to moment
17msec per cycle up to 5 minute control functions


For more details and ppt, please visit
http://science.smith.edu/ jcardell/Readings/TRUST%20US/PwrSys%20Slides/4.%20ED1.ppt
Reply

#2

to get information about the topic "economic dispatch " full report ppt and related topic refer the page link bellow

http://seminarsprojects.net/Thread-econo...al-network

http://seminarsprojects.net/Thread-econo...uzzy-logic

http://seminarsprojects.net/Thread-econo...ginal-rate

http://seminarsprojects.net/Thread-least...dispatch-1

http://seminarsprojects.net/Thread-econo...d-dispatch
Reply



Forum Jump:


Users browsing this thread:
1 Guest(s)

Powered By MyBB, © 2002-2024 iAndrew & Melroy van den Berg.